Road repaving in Knoxville

Jim Hagerman, city engineering director, emailed me the list of roads that will be repaved under the city’s new contract in the next year.

Check them out here, starting on page 70: 2013 spec book – resurfacing. This doc also includes the city’s contract overall.

Some roads up for work:

  • Cherokee Trail
  • Cedar Bluff Road (between Peters and Kingston Pk)
  • Strawberry Plains Pike from I-40 to the city limit
  • Sutherland Ave from Hollywood to Partners Pl
  • University Ave

There are a few others, but those are the ones that stood out to me. Good bedtime reading.

About Gerald

A reporter in Knoxville, TN. Work (mostly) inside and play (mostly) outside. I'm a part of the X or the Y generation. None of us claim the other.
This entry was posted in Knoxville and tagged . Bookmark the permalink.

So what do you think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s